CSRT Module 5R: Quality Controls for Concrete Surface Repairs — Post-Placement Inspection


Module 5 covers quality control measures necessary for a Concrete Surface Repair Technician to perform a post-placement inspection. This module presents a post-placement checklist that includes specification criteria, general information, curing and protection (placement temperatures and curing/protection procedures implemented), repair material strength (test specimens and strength requirements), and repair material bond (soundings and pull-off testing). Pull-off testing for determination of bond strength and identification of failure mode is detailed in this module. 

Pre-Requisites

To complete this module, you will need a printed copy of the Post-Placement Inspection Checklist, ASTM C1583/C1583M, and ICRI Guideline No. 210.3R (210.3R is included in the resources tab in this course). 

Estimated Time to Complete: 1 Hour
Minimum Passing Score: 93%
You will have two chances to pass each module quiz. You may review the content in the course, but once you begin the quiz, you will no longer have access to course content.